Kenall performed geotechnical services for Harris County Flood Control District (HCFCD) for the Channel Conveyance Improvements Project, located adjacent to Timberlake Estates Subdivision, in Harris County, Texas (Channel Unit K163-00-00, Key Map 368-L). This project focused on improving channel conveyance K163-00-00 to improve drainage in the Timberlake Estates Subdivision. The Channel is approximately 6,300 feet long, stretching from Cypress North Houston downstream to the vicinity of an existing concrete drop structure located 2,100 feet from the confluence of W/K100. The depth of the Channel varies along its length from approximately 4 feet to 20 feet, and retaining walls are included for certain channel sections.
Services
Sector
Client
Harris County Flood Control District
Location
Texas
Budget
Related Projects