The Westpark Toll Road Section 4 Project encompassed 3,700 linear feet of 4-lane divided toll road facility and bridge.
Kenall performed all requisite engineering design services for the project, including the bridge layout at Dairy Ashford, and the plan for the bridge retaining walls. Our responsibilities included subsurface exploration, soil testing, engineering analysis, foundation recommendations, control surveys, preparation of 30%, 60%, 90% and 100% construction drawings and specifications, and cost estimates. We also performed the environmental assessment required for the project.
Services
Sector
Client
Harris County Toll Road Authority
Location
Texas
Budget
Related Projects